Not Every Slip Is A Risk — Infectious Disease / Vaccines
A Clinical Project Manager scenario. Setting: Study management. About 8 minutes.
You are working with The risk register, Already crowded. The situation unfolds as you decide, and each choice changes what happens next.
2 scored decisions, each graded against a published rubric rather than marked right or wrong.
Competency areas assessed: D4, D6.
Anchored to ICH E6(R3) §2.2 — a risk register that lists everything ranks nothing, and float exists to absorb exactly this.; ICH E6(R3) §2.13 — a status color is a claim. Amber for an absorbed slip trains readers to ignore amber..
You make the decisions and are scored on them against the global GCP standard (ICH E6(R3)). Free, no account needed to try.